“Can you smell that?” Four words that ended up costing us our gas supply for over three months. And it all started during a routine boiler service.
The engineer was working near the site's main incoming gas meter when he noticed a faint smell. Gas.
He took out his detector and checked around a crack in the pavement. The readings climbed immediately. We had a problem.
There wasn't much discussion about what needed to happen next. We shut off the gas supply to the entire factory and contacted the gas network operator. Before long, the site was full of emergency response vehicles.
After investigating, they believed the underground gas main had probably been leaking for some time. And there was no chance of the supply being turned back on until the problem was repaired. Fair enough. Nobody was going to take chances with a gas leak.
But now we had another problem. It was the beginning of November. And we'd just lost the heating for the entire factory. Not ideal timing.
But this wasn't simply about keeping everyone warm. Part of our manufacturing process used a bonding adhesive that needed a temperature of 25°C to cure correctly. Without that temperature, we had a potential product-quality problem. Without a solution, we had a production problem. And without production, we had a much bigger business problem. All because somebody had noticed a smell during a boiler service.
The repair itself wasn't straightforward either. The underground gas main needed excavating. A leaking flange had to be removed. A replacement section needed welding into position. And before any hot work could begin, the system had to be safely isolated, depressurised and purged.
This wasn't going to be a quick fix. So we had to find another way to keep the factory operating.
We brought in a temporary 250kVA heating system with its own diesel fuel supply. It wasn't the permanent solution. But it gave us the heating capacity needed to support production while the gas supply remained isolated.
And it's a good job we did. Because the permanent gas supply wasn't restored until the middle of February. From November to February. Through the coldest part of the year. All because of a gas leak that could easily have gone unnoticed.
I've thought about that incident a few times since. Because when you're responsible for engineering, solving the original fault is often only a small part of the job.
We didn't just have a gas leak to deal with. We had to consider: Safety. Heating. Product quality. Production. Temporary utilities. Cost. And keeping the business operating while the permanent repair was completed.
One problem had created another six. And that's something you don't always appreciate until you're responsible for the whole department.
Making the safe decision was the easy part. Managing everything that followed was the real challenge.
Lesson #21: Engineering leadership isn't just about fixing the original problem. It's about managing everything that problem creates. Sometimes the most important engineering work happens while you're waiting for the actual repair to be completed.
Have you ever had one seemingly small fault turn into months of completely unexpected problems?